Frequently Asked Questions  

Q1 - How many days does the sealing service take?

It usually takes three days for interlocking:  Washing Part, Sanding Part,  Sealing Part. And Two days for concrete:  Washing Part, Sealing Part.

Q2 - How long does it take to dry the sealant?

According to manufacturer touch dry in 20 -30 minutes, can be driven on in 6 hours. We recommend to postpone with parking till the next day.

Q3 - What is the main apprehension when it comes to sealing and sanding?

In most cases an unpredictable weather is the main apprehension that could cause issues on the way. 

Let’s talk

Q4 - What additional services you recommend in addition to sealing ?

We recommend to fix all the interlocking defects such as leveling the surface or stone separation before doing a sealing service.

Q5 - How strong is the power-washer? Is it capable of removing oil stains?

Power-washer we use has 4200psi pressure capability, but unfortunately it does not remove oil/fuel stains from the stone/concrete surfaces. Certain chemicals could help with that, but there is a risk present in terms of damaging the stone as well as cause fading or color change.